Entry Criteria for Each Test Phase | Test Entry Criteria


 List of Entry criteria for each test phase like functional testing, Integration testing, UAT, Pre-prod & Non-Functional testing:

Test Phase
Application Environment / Hardware / Software
Functional Testing
  • URL for logging into QA Environment
  • User IDs and Passwords for accessing Test Environment
  • Integration between App and Other Upstream/Downstream systems
  • Test Cases and scripts are Prepared, Signed-off
  • Configured system - as per Business requirements
  • Unit Test results should be shared from Dev team

Integration Testing
  • URL for logging into SIT Environment
  • User IDs and Passwords for accessing Test Environment
  • Integration between App and Other Upstream/Downstream systems
  • Test Cases and scripts are Prepared, Signed-off
  • Configured system - as per Business requirements
  • Unit Test results should be shared from Dev team

UAT
  • URL for logging into UAT Environment
  • User IDs and Passwords for accessing above Test Environment
  • List of User stories for each sprint
  • Test Cases and scripts are Prepared, Signed-off
  • Configured system - as per Business requirements

Pre-Prod

  • URL for logging into Pre-Prod Environment
  • User IDs and Passwords for accessing above Test Environment
  • List of User stories for each sprint
  • Test Cases and scripts are Prepared, Signed-off
  • Configured system - as per Business requirements

Non-Functional
  • Separate testing environment with the required set up